Unfortunately many people are under the misguided belief that wood or laminate may be a problem with water but water damaged vinyl flooring no way.
Water under vinyl flooring concrete.
So it does happen.
The steps in this guide on how to install vinyl plank flooring on concrete are quite easy to follow.
Vinyl flooring can either be glued to the subfloor or it can float on top of it and either way moisture underneath it causes problems.
Installations in wet rooms should also include measures to ensure that the seams and perimeter of the floor are well sealed to prevent moisture getting under the luxury vinyl onto subfloor below.
For installation of vinyl flooring you need a smooth even surface for the underside of the flooring to achieve the best contact for adhesion.
A concrete floor with a too high moisture content can wreak havoc on a vinyl floor.
But it s safe to say that next to tile vinyl flooring for basements.
Generally speaking vinyl flooring won t be damaged by normal amounts of water on its surface and it shouldn t be damaged by occasional dampness on the concrete slab below.
So moisture came up through the cracks in the slab and caused the vinyl flooring to mildew.
We had vinyl flooring over a concrete slab a slab which cracked all the time because it wasn t poured as thick as code required.
The locking joints will keep water from going thru and you need to silicone the 3 8 gap at the edge by the wall to prevent any water from getting under the laminate.
If you have more water than that in your basement you shouldn t be finishing it in the first place.
When i called pergo to ask what if water gets under the laminate on the concrete she said don t let any water get under the laminate.
Water damaged vinyl flooring a problem on concrete and wood substrate.
A concrete floor seems like the perfect base for a vinyl floor installation.
The result was water damaged vinyl flooring.
Also it is important to take time and prepare well before you start assembling.
Water is an inherent part of the hydration process of concrete.
So was this a manufacturing problem.
Once the slab is poured the excess moisture must leave the slab in order to strengthen the concrete bond.
For this reason installations over concrete should always include moisture testing and moisture control measures for the slab.